Information for 2MASS Science Team Meeting, June 4-5, 1997

This page links all the information prepared for the Science Team prior to the 2MASS meeting at IPAC on June 4-5, 1997. We are attempting to provide all the information on the web instead of the usual FedEx mailing. This page will be updated as more information is put online. The list of changes is given below.

Specific information for the meeting is linked to each agenda item given below. General references:

The type of bullets used below distinguish between links to:

The filled bullets are quite noticeable, and thus you can easily page down the agenda to find those items with prepared documents.

The emphasis of this meeting is on the readiness of the Northern hemisphere mountaintop system and the IPAC pipeline for survey operations in preparation for making the case to the 2MASS external review board in July.

2MASS Science Team Meeting and Quality Assurance and Data Management Review

IPAC Main Conference Room

June 4-5, 1997 8:30am -- ?

June 4, 1997

TimeAgenda ItemPresenter
8:30Opening remarks 
8:45A word from our sponsor(s)LaPiana, Bicay...
9:15
Hardware status reports
 
 Cameras Skrutskie
 Telescopes and Sites Stiening
 Project schedule Stiening
10:00Break  
10:15
Preparation for North operational readiness review
 
 IntroductionSkrutskie
 Survey strategy
  • integration time, nframes, ....
  • strip overlap
  • precession effects
  • telescope pointing
  • airglow
  • discussion re reducing integration time from 1.3 to 1.0 s
E. Howard / R. Stiening
 Survey simulation results with adopted parameters E. Howard
12:00Lunch (MSX Video will be shown, narrated by S. Price) 
1:00
Preparation for North operational readiness review (continued)
 
1:00Photometric calibration R. Cutri
2:00Survey schedulingE. Howard/B. Hartley
2:30Tile database managementE. Howard
3:00Onsite quality analysis M. Skrutskie
3:15Mt. Hopkins logistics and initial operationsR. Stiening
3:30Break  
3:45Mt. Hopkins facility performance relative to Level 1 specs R. Cutri

June 5, 1997

TimeAgenda ItemPresenter
8:30Pipeline status / Data Management Review
2MAPPS v1.0 Status and Schedule
  • Performance on 3-channel data
  • Operations and data management plan
  • Status of liens from Point Source and Extended Source CDR

Main references:

Other references:

R. Cutri, J. Fowler
10:15Break  
10:30Verification plan / Data Quality review
  • Subsystem quality checks
  • Database/Global quality checks
  • Ground truth observations with separate systems
  • Selection of quality test fields (ten 6x6 degree plates)
R. Cutri, L. Fullmer
12:00Lunch 
1:00Verification plan / Data Quality review (continued) "
2:00Database status report C. Lonsdale
2:30Core projects
  • Brief outline
  • Project support of verification/analysis
  • Project demands on IPAC and the database
M. Bicay
M. Weinberg
J. Liebert
J. Huchra/S. Schneider
3:15Break  
3:302MASS and asteroids studies S. Price
4:00Outside use of survey data pre-release
  • Status of existing collaborations and current proposals
M. Skrutskie
4:302MASS presence at AAS January 1998  

Additions / changes since noon 28 May 1997

Changes made on 28 May

Changes made on 29 May

Changes made on 30 May

Changes made on 2 June




http://spider.ipac.caltech.edu/tchester/2mass/team meeting.html
Comments to: Tom Chester
Last update: 2 June 1997